Inauguration of Ease 1st cleanroom production training plant

On 10 December the first cleanroom production training school Ease (European aseptic and sterile environment), located in Illkirch-Graffenstaden near Strasbourg, was inaugurated. This project, led by the University of Strasbourg*, was financed by the Work-linked Training component of Programme d'investissements d'avenir (PIA) via Banque des Territoires.

Education & training
31December2018

Le bâtiment Ease
The PIA therefore provided €9.76mn of a total of €27.2mn (including €19mn for the building and €8.2mn for equipment). The European Union - through the European Regional Development Fund (ERDF) -, the Grand Est region and the Euro metropolis of Strasbourg took part in the construction of Ease to the amount of €4mn each, while private backers provided €5.44mn in funds.

 

The Ease project was the first recipient of the PIA in May 2011 under the section dedicated to sandwich courses and apprentice accommodation. Ease is partnered with training and academic organisations as well as with industrials from the medicine, chemistry and agri-food sector. The building houses a pharmaceutical manufacturing plant with a total of 4,300 sq.m of floor space, including over 2,000 sq.m. of cleanrooms. This high-tech facility is equipped with 3 production lines (sterile injectable liquids, tablets, capsules and biopharmaceuticals) and all systems to support production (air treatment, production of utilities, ultrapure water and stream, and pharmaceutical fluids).

Ease is linked to a university residential building for those following sandwich courses located 400 m away, in partnership with the Crous of Strasbourg.

 

* In partnership with the Alsace Biovalley competitiveness centre

 

 

 

 

 

 

Haut de page